| Second floor slab |
![]() |
| Keron and Steve preparing a column |
![]() |
| Niza and Bryn carrying a AFS corner panel |
![]() |
| Ben V de-nailing |
![]() |
| Ben and Chris standing an acro prop |
![]() |
| Site security |
| Chris, the new telehandler operator |
| Gary helping out the bobcat |
![]() |
| Ben rigging a load |
| Second floor slab |
![]() |
| View from the laneway |
| Ben organising steel |
| Looking down the ramp |
| Chris taking a break |
| Stuart the steel fixer |
| Last pour of the first floor slab |
| Sam and Ben helping out the scaffolders |
| Ben bundling up scaffold tubes |
| View from the second floor |
| Alex with the crane |
| Gary and Ben |