| Keron and Brad |
| One floor to go |
| Dusk time on the top slab |
| Opening up the ramp |
| Unloading all the formwork in Wedgefield |
| Ben rigging the laod |
| The Big RIGger |
| Sunrise |
| Ben chaining up some steel |
| The beginning of the external wall cladding |
| The view from one of the 2 bedroom balcony's |
![]() |
| Gary and Bryn discussing how straight the walls are |
![]() |
| Niza, Brad and Steve standing one of the last walls |
| View from Unit 20's balcony |
![]() |
| Jarvis studying the plans |
| Chris moving around more scaffold |
![]() |
| With the help from our new French labourer |
![]() |
| Bryn checking the line of a wall |
| Conner cutting some track for the AFS walls |
![]() |
| View from the bedroom in Unit 15 |
![]() |
| Steve setting out the roof! |
![]() |
| Russel looking happy |
| Metres and metres of cables for the electricians to run |
| Living/Dining area in Unit 13 |
![]() |
| Unit 12 balcony |
![]() |
| John plastering away |
![]() |
| Jimmy hiding in the corner |
| Western elevation |
| Bryn and Neville on the top floor scaffold |
| 26 tonne of roof steel |
| Looking down Cristie's Lane |