| Starting the texture coat and painting |
![]() |
| Plenty of gyprock under the carpark |
| We ran out of red paint |
| framing out materials |
| first floor carpark |
![]() |
| Neville's storeroom. Stay clear! |
![]() |
| Unit 1 - completely sheeted |
| ready for flushing and painting |
| Ben hiding behind some gyprock |
![]() |
| Flo being French |
![]() |
| Bryn and Ben fixing a sheet of gyprock |
![]() |
| Tim texture coating the wall |
![]() |
| Jarrad patching the cladding |
| Chris and Morgan stacking scaffold planks |
![]() |
| Probably the blog's most familiar face. Keron doing the external window reveals |
![]() |
| Neat detail of the cladding around one of the aluminium louvers |
| A unit framed out and ready for sheeting |
| Another one |
![]() |
| Steve and Brad working....clearly |
| Looking from the balcony of the one bedroom units |
![]() |
| Mark applying the acoustic lagging to all the pipes |
![]() |
| Up close on the texture coat finish on the boundary wall |
![]() |
| John and Peter measuring up a fire duct |
![]() |
| Had to call in the big gun from Kadardup to give us a hand for 2 weeks |
![]() |
| Paul putting the final touches on the roof |
![]() |
| Roy trying to avoid the camera |
![]() |
| Paul and Roy |
![]() |
| Looking down at the site office, truck and skip bin off the top floor |
![]() |
| Neville, Jeremy and Keron discussing the cladding |